– Assessing the property and determining the best location for the well and septic system
– Obtaining necessary permits and ensuring compliance with local regulations
– Excavating and preparing the site for installation
– Installing the well casing, pump, and pressure tank
– Installing the septic tank, drain field, and necessary plumbing connections
The ideal candidate should have expertise in well and septic system installation with a strong attention to detail. The project is expected to be of medium size, taking approximately 1 to 3 months to complete. We are looking for an intermediate level professional who can handle the job with minimal supervision.
Posted On: July 12, 2024 13:25 UTC
Category: Full Stack Development
Skills:Linux System Administration, PHP, System Administration, WordPress, Web Development
Country: United States
click to apply
Powered by WPeMatico
